Case Study

Situation:
The company began developing new technology that lead them to experience rapid growth and production. However, they lacked an up-to-date IT infrastructure that fell in line with where the business was headed. OPM was looking for a way to transform their infrastructure to become more scalable and allow them to keep up with their current growth as well as the future challenges they face. Oxford Performance Materials, Inc (OPM) Aerospace Industrial Technology.
Response:
After talking with IT Direct among other IT companies to weigh their options, OPM was impressed by our strategic approach in solving their challenges. We performed a complete needs analysis to determine which IT upgrades were necessary to increase efficiency and allow for current and future growth.
Results:
Through our strategic planning and analysis, we discovered that the company was overpaying for their hosted email services, had unused Internet bandwidth, an outdated Enterprise Resource Planning (ERP) system, and that their encryption software was slowing down their performance. IT Direct became OPM’s fully outsourced IT department and performed a complete IT infrastructure upgrade that resulted in major cost-savings, improved email systems, enhanced ERP speed, and increased efficiency.